06/16/2026
Timelapse Week 34b* - caulking the ceiling (continued), testing concrete (for moisture; part of the prep for our epoxy floor coating), and drilling concrete (to reinforce the small concrete pour we are working on with rebar). We've also been working on marking out our electrical outlets/switches/etc.
*for anyone keeping track, this was technically all the week BEFORE our last video (the one featuring Will and his music!)