01/10/2026
🆕 Cambi is entering Egypt with a major project in Alexandria.
Cambi will supply four Thermal Hydrolysis Process (THP) systems for the upgrade of the Alexandria West wastewater treatment plant, working with a joint venture of Metito Water Treatment and Hassan Allam Construction.
The project will increase treatment capacity while introducing biological treatment and anaerobic digestion to one of Alexandria’s two main wastewater treatment plants.
By enabling substantially higher digester loading rates, Cambi THP will help:
🔹 Reduce the number of required digesters from 16 to 8
🔹 Increase biogas production and help make the plant energy self-sufficient
🔹 Improve dewatering and reduce final solids for disposal
🔹 Avoid the equivalent of around 20 25-tonne truckloads of final solids every day
🔹 Save valuable space on a land-constrained site
The project marks an important milestone for Cambi as our first delivery in Egypt, supporting more efficient and sustainable wastewater and sludge management in Alexandria.
Read more about the Alexandria West project 👇
https://eu1.hubs.ly/H0yKW900